| Customization: | Available |
|---|---|
| Production Scope: | Product Line |
| Condition: | New |
| Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
|---|
| Payment Methods: |
|
|---|---|
| Support payments in USD |
| Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
|---|
| Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
|---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency



|
Item
|
Parameter
|
|---|---|
|
Power Supply Voltage
|
380V
|
|
Total Power
|
4kW
|
|
Workpiece Size
|
Inner diameter 300mm, maximum outer diameter 1000mm, maximum width 400mm (The inner hole of the winding disc can be customized according to the workpiece size)
|
|
Overall Machine Size
|
1400mm×1370mm×2100mm, lifting height 1000mm
|
|
Stretch Film Size
|
Width 100mm, diameter 200mm, shaft inner hole 76mm
|
|
Inner Hole of Winding Disc
|
670mm
|
|
Winding Speed
|
10-50Hz, adjustable
|
|
Motor Configuration
|
Rotating motor 1.5kW (equipped with No.2 cycloid pinwheel reducer); Winding motor 2.2kW; Lifting motor 370W
|
|
Control System
|
Independently developed programming
|
|
Host Motor
|
National Standard 2.2kW
|
|
Display Screen
|
Text screen + PLC
|
|
Buttons
|
Y38 Series
|
Q: what's the packing of the machine?
A.In wooden pallet, In plastic film, the spare parts and cabinet packed by wooden box.
Q: What's the payment term?
A.Usually by T/T ( 30% in advance, the balance shoud be paid shipping before)
Q: Can I change the motor as my local voltage?
A.We can change the voltage as your requirement, and there's no extra charge.
Q: How do your control quality?
A.W have an inspection team to check the products at all stages of the production process.
Q:What parameter is necessary?
A.The nail diameter, nail length ect are mainly needed, detailed information would be appreciated, Special requirement can be discussed.
Q:How long will it take to deliver goods?
A:We will deliver the goods within 10 days for spare parts, other goods maybe take a little more times to test and prepare, we will deliver the goods within the deadline which both parties agreehainiud.